This was a marine trip to visit the first offshore wind farm in the USA. I wanted to see those wind mills and to see what birds were out in those waters on a random day in mid June. Almost none, at least not on June 20, 2018! I also wanted to learn what science projects were under way at these wind mills.
Departed dock on Martha's Vineyard Fast Ferry, 1347 Roger Williams Way, North Kinston, RI.
Marthas Vineyard Fast Ferry
Martha's Vineyard Fast Ferry - Google Maps
Rhode Island Fast Ferry - Offshore Wind Farm Support
2pm departed dock. 5pm returned to dock.
71miles round trip.
Winds SE 15mph. Seas 3-4 feet.
Negligible cloud cover.
Air Temp 70F.
Water temp 61F at wind farm. 67F near dock.
Very few birds seen during entire trip.
Great Black-backed Gull, 20.
Herring Gull, 15.
DC Cormorant, 2.
Mute Swan, 1 flying south, one mile from dock.
Observing birds was very difficult because of wind and high speed (over 30knots) of the ferry, but there were essentially no birds, within a mile of this ship, along the whole offshore route.
Block Island Wind Farm - Deepwater Wind
MOTUS tracking of birds, bats, etc.
Cutting-Edge Technology at Block Island Wind Farm Helping Scientists Track Bird and Bat Activity Offshore - Deepwater Wind
And I am following-up re DHI with JOkeeffe@dwwind.com ...
dhi block island wind farm - Google Search
Automated bird monitoring system lands on pioneer US wind farm.
Block Island to monitor bird and bats - 4C Offshore.
America’s First Offshore Wind Farm Spins to Life - The New York Times.
IHA Application for Construction of the Block Island Wind Farm (2014).
Block Island Offshore Wind Farm Gets Its Own MUSE | Offshore Wind.
Supporting offshore wind energy development in the Netherlands with digital metocean database.
DHI's MUSE system is also being used in RI...
and in the UK...
block island wind farm video - Google Search.
block island wind farm map - Google Search.
block island wind farm controversy - Google Search.
Here is a photo of wind turbines #4 and #5 in the Block Island Wind Farm, the first offshore wind farm in the USA, being serviced by the custom-built ship approaching #4. Each blade is 240 feet long. Click on any image to enlarge it, then press ESC key to return...
More tomorrow...


